PROJECT OVERVIEW   
Two 20-ton split air units at Clearlake Educational Center have failed and will be replaced. 
PROJECT STATUS
The two 20-ton split system air conditioning units that service the cafeteria and kitchen have failed.  These units are 15 years old and repair is not cost effective. The two systems that need to be replaced require R-22 refrigerant which is being phased out and is not commercially available due to EPA phase-out guidelines. Both condensing unit compressors, condenser fans and motors have been changed out multiple times and have now failed.

The estimated cost to replace the failed units with R134A refrigerant equipment is between $40,000 and $50,000. Currently, a portable air conditioning unit is being rented at a cost of $5,500 per month.

Equipment component replacement is included in the funded sales surtax list under the category of Air Conditioning and Air Distribution Equipment Renewal (5206), but Clearlake is not scheduled until the fifth year of the sales surtax program. This project is only part of the work that needs to be done at Clearlake Education Center. The remainder will be done in sequence, with the exception of unanticipated failures.

Once quotes are received, a purchase order will be issued utilizing the sales surtax for the work.

An update will be provided at the August ICOC meeting.


 
PROJECT UPDATE
Updates will be posted in this section. 
PROJECT MANAGER
To Be Determined.
FUNDING SOURCES
Project will be funded by Half-Cent Sales Surtax. 
DELIVERY METHOD
To Be Determined. 
DESIGNER
To Be Determined 
CONTRACTOR
To Be Determined.
 

 Documents

A- Clearlake Project Status Report_ICOC June 17 2015.pdf
A- Clearlake Project Status Report_ICOC June 17 2015Use SHIFT+ENTER to open the menu (new window).
6/25/2015 10:45 AMBREVARDSCHOOLS\Lindemann.David
B- Clearlake Exhibit 1_ICOC June 17 2015.pdf
B- Clearlake Exhibit 1_ICOC June 17 2015Use SHIFT+ENTER to open the menu (new window).
6/25/2015 10:45 AMBREVARDSCHOOLS\Lindemann.David
C- Clearlake Summary_ICOC June 17 2015.pdf
C- Clearlake Summary_ICOC June 17 2015Use SHIFT+ENTER to open the menu (new window).
6/25/2015 10:45 AMBREVARDSCHOOLS\Lindemann.David

 Images

ThumbnailPicture Size
Clearlake 11x17 Landscape

 Calendar

There are currently no upcoming events.