Fairglen Elementary

Fairglen Elementary

PROJECT OVERVIEW   
Fairglen Elementary School has various projects to be addressed which are stated in Attachment F.  The attachment is located in the documents section.
 
PROJECT STATUS
Fairglen Elementary School is one of the schools on the priority list to be addressed through summer 2017.

Because the cost of the work is estimated to exceed the $2 million threshold for utilizing the District’s continuing service contracts, the work must be awarded through a competitive process. The project will be done through a design build contract, where the successful firm provides construction and final design/permitting services. This process requires the District to develop a Design Criteria Package (DCP) that is prepared by a third party architect (the Design Criteria Professional) who outlines the scope and minimum specifications and/or requirements for the project. The proposal from the Design Criteria Professional is scheduled for School Board consideration on August 25, 2015.

In order to achieve economies of scale and reduce administrative costs, this project will be combined with other schools on this list for implementation over the next two years.

                    FACILITY RENEWAL                                                                                                                                             

51 01          Safety and Building Code Deficiency Corrections                                                            $14,436

52 04          Central Mechanical Plant Renewal                                                                                $579,528

52 05          Cooling and Heating Control System Renewal                                                                $171,129

53 07          Roofing System Renewal                                                                                             $1,914,963

53 08          Exterior Building Wall Finish System Renewal                                                                $16,063

54 13          Electrical Distribution System Renewal                                                                          $228,457

54 15          Interior and Exterior Lighting Equipment Renewal                                                          $88,349

                    Facility Renewal Total                                                                                               $3,012,925

                                                                                                                                                                                                       

                    EDUCATIONAL TECHNOLOGY                                                                                                                        

65 03          Classroom Technology Infrastructure (Electrical, HVAC, Data)                                         $93,438

                    Educational Technology Total                                                                                   $93,438

                                                                                                                                                                                                       

                    Total All Categories                                                                                                   $3,106,363

 

The District Security project and the remaining Educational Technology components will be handled separately.

Project management, administrative and permitting staff time will be charged to the sales surtax fund.


 
PROJECT UPDATE
 Projected Construction Start Date in Summer of 2016
PROJECT MANAGER
James Hudson - Maintenance Coordinator/Project Manager
FUNDING SOURCES
 Project is funded by Half-Cent Sales Surtax
 
DELIVERY METHOD
A Design Build Contractor will be selected through a Request for Proposals process.
 
DESIGNER/DESIGN CRITERIA PROFESSIONAL
 BRPH Architects-Engineers, Inc. is creating the design criteria package
CONTRACTOR
 To Be Determined

 Documents

Design Criteria Package BRPH Fairglen Kennedy Saturn web site.pdfDesign Criteria Package BRPH Fairglen Kennedy Saturn web site
Fairglen Elementary - Attachment F.pdfFairglen Elementary - Attachment F

 Images

ThumbnailPicture Size
Fairglen 11x17 Landscape

 Calendar

There are no items to show in this view of the "Fairglen Calendar" list. To create a new item, click "New item" above.