Hoover, Herbert C. Middle

Herbert C. Hoover Middle

PROJECT OVERVIEW   
Herbert C. Hoover Middle School has various projects to be addressed which are stated in Attachment F.  the attachment is located in the documents section.
 
PROJECT STATUS
Hoover Middle School is one of the schools on the priority list to be addressed through summer 2017.

Because the cost of the work is estimated to exceed the $2 million threshold for utilizing the District’s continuing service contracts, the work must be awarded through a competitive process. The project will be done through a design build contract, where the successful firm provides construction and final design/permitting services. This process requires the District to develop a Design Criteria Package (DCP) that is prepared by a third party architect (the Design Criteria Professional) who outlines the scope and minimum specifications and/or requirements for the project. The proposal from the Design Criteria Professional is scheduled for School Board consideration on August 25, 2015.

In order to achieve economies of scale and reduce administrative costs, this project will be combined with other schools on this list for implementation over the next two years. The following categories should be included in the project:

         
    FACILITY RENEWAL    
         
  52 04 Central Mechanical Plant Renewal   $192,503
  52 05 Cooling and Heating Control System Renewal   $185,668
  52 06 Air Conditioning and Air Distributions Equipment Renewal   $722,170
  53 08 Exterior Building Wall Finish System Renewal   $57,747
  53 09 Exterior Door/Window/Louver System Renewal   $432,034
  52 10 Building Water and Sanitary Piping System Renewal   $152,923
  54 12 Electrical Supply System (Transformers, Switchgear, Wiring) Renewal   $34,220
  54 13 Electrical Distribution System Renewal   $738,948
  52 16 Air Supply and Exhaust System Renewal   $815,574
         
    Facility Renewal Total:  

$3,331,787

         
         
    EDUCATIONAL TECHNOLOGY    
         
  65 03 Classroom Technology Infrastructure (Electrical, HVAC, Data)   $101,377
         
    Educational Technology Total:   $101,377
         
         
    Total All Categories:   $3,433,164
         
Purchase orders were issued to replace failed exhaust fans under category 5216.

The District Security project and the remaining Educational Technology components will be handled separately.

Project management, administrative and permitting staff time will be charged to the sales surtax fund.

PROJECT UPDATE
Updates will be posted in this section.
 
PROJECT MANAGER
Thomas Hood - Construction Manager
 
FUNDING SOURCES
 Project is funded by Half-Cent Sales Surtax
 
DELIVERY METHOD
 A Design Build Contractor will be selected through a Request for Proposals process.
DESIGNER/DESIGN CRITERIA PROFESSIONAL
  The Design Criteria Package is created by TLC Engineering for Architecture, Inc.
CONTRACTOR
To Be Determined
 

 Documents

Design Criteria Package TLC Engineering for Architecture Hoover.pdfDesign Criteria Package TLC Engineering for Architecture Hoover
Hoover Middle - Attachment F.pdfHoover Middle - Attachment F