PROJECT OVERVIEW   
 John F. Kennedy Middle School has various projects to be addressed which are stated in Attachment F.  The attachment is located in the documents section.
PROJECT STATUS

Kennedy Middle School is one of the schools on the priority list to be addressed through summer 2017.

Because the cost of the work is estimated to exceed the $2 million threshold for utilizing the District’s continuing service contracts, the work must be awarded through a competitive process. The project will be done through a design build contract, where the successful firm provides construction and final design/permitting services. This process requires the District to develop a Design Criteria Package (DCP) that is prepared by a third party architect (the Design Criteria Professional) who outlines the scope and minimum specifications and/or requirements for the project. The proposal from the Design Criteria Professional is scheduled for School Board consideration on August 25, 2015.

In order to achieve economies of scale and reduce administrative costs, this project will be combined with other schools on this list for implementation over the next two years. The following categories should be included in the project:

    FACILITY RENEWAL    
  51 01 Safety and Building Code Deficiency Corrections   $35,373
  51 02 ADA Code Deficiency Correction   $49,613
  52 04 Central Mechanical Plant Renewal   $717,786
  52 05 Cooling and Heating Controls System Renewal¹  
  52 06 Air Conditioning and Air Distribution Equipment Renewal   $834,426
  53 09 Exterior Door/Window/Louver System Renewal   $12,573
  52 10 Building Water and Sanitary Piping System Renewal   $149,827
  54 12 Electrical Supply System (Transformers, Switchgear, Wiring)   $20,955
  54 14 Electrical Components (Lighting Protection, Intercom, Generator) Renewal   $524,918
         
    Facility Renewal Total:   $2,345,471

 

           1The BAS was rated condition code 1, but was inadvertently omitted from Attachment F.This       will need to be funded through contingency at an estimated cost of $250,000.

    EDUCATIONAL TECHNOLOGY    
         
  65 03 Classroom Technology Infrastructure (Electrical, HVAC, Data)   $99,817
         
    Educational Technology Total:   $99,817
         
    Total All Catagories:   $2,445,288

 

The District Security project and the remaining Educational Technology components will be handled separately.

Project management, administrative and permitting staff time will be charged to the sales surtax fund.

PROJECT UPDATE
 Updates will be posted in this section
PROJECT MANAGER
James Hudson - Maintenance Coordinator/Construction Manager
FUNDING SOURCES
 Project is funded by Half-Cent Sales Surtax
 
DELIVERY METHOD
A Design Build Contractor will be selected through the Request for Proposals process.
 
DESIGNER/DESIGN CRITERIA PROFESSIONAL
 To Be Determined
CONTRACTOR
 To Be Determined

 Documents

Design Criteria Package BRPH Fairglen Kennedy Saturn web site.pdfDesign Criteria Package BRPH Fairglen Kennedy Saturn web siteBREVARDSCHOOLS\Hann.Susan
Kennedy Middle - Attachment F.pdfKennedy Middle - Attachment FBREVARDSCHOOLS\Weaver.Debbie

 Images

ThumbnailPicture Size
Kennedy 11x17 Landscape

 Calendar

There are no items to show in this view of the "Kennedy Calendar" list. To create a new item, click "New item" above.