PROJECT OVERVIEW   
 Melbourne High School has various projects to be addressed which are stated in the Attachment F.  The attachment is located in the documents section.
 
PROJECT STATUS
Melbourne High School is one of the schools on the priority list to be addressed through summer 2017.

Because the cost of the work is estimated to exceed the $2 million threshold for utilizing the District’s continuing service contracts, the work must be awarded through a competitive process. The project will be done through a design build contract, where the successful firm provides construction and final design/permitting services. This process requires the District to develop a Design Criteria Package (DCP) that is prepared by a third party architect (the Design Criteria Professional) who outlines the scope and minimum specifications and/or requirements for the project. The proposal from the Design Criteria Professional is scheduled for School Board consideration on August 25, 2015.

The following categories should be included in the project:

         
    FACILITY RENEWAL    
         
  51 03 Fire Alarm Renewal   $92,722
  52 04 Central Mechanical Plant Renewal   $2,167,684
  52 05 Cooling and Heating Control System Renewal   $631,822
  52 06 Air Conditioning and Air Distribution Equipment Renewal   $1,331,800
  53 08 Exterior Building Wall Finish System Renewal   $66,978
  53 09 Exterior Door/Window/Louver System Renewal   $88,069
  52 10 Building Water and Sanitary Piping System Renewal   $24,351
  54 13 Electrical Distributions System Renewal   $344,524
  52 16 Air Supply and Exhaust System Renewal   $2,233,183
         
    Facility Renewal Total:   $6,981,133
         
         
    EDUCATIONAL TECHNOLOGY    
         
  65 03 Classroom Technology Infrastructure (Electrical, HVAC, Data)   $277,588
         
    Educational Technology Total:   $277,588
         
         
    Total All Categories:   $7,258,721
         
A purchase order was also issued in August to replace three failed R-22 split system air conditioning units in the Auditorium under category 5206.

The District Security project and the remaining Educational Technology components will be handled separately.

Project management, administrative and permitting staff time will be charged to the sales surtax fund.

 
PROJECT UPDATE
Updates will be posted in this section. 
PROJECT MANAGER
Thomas Hood - Construction Manager 
FUNDING SOURCES
 Project is funded by Half-Cent Sales Surtax.
 
DELIVERY METHOD
A Design Build Contractor will be selected through the Request for Proposals process.
DESIGNER/DESIGN CRITERIA PROFESSIONAL
Design criteria package is created by TLC Engineering for Architecture, Inc. 
CONTRACTOR
To Be Determined
 

 Documents

Design Criteria Package TLC Engineering for Architecture Melbourne High.pdfDesign Criteria Package TLC Engineering for Architecture Melbourne High
Melbourne High - Attachment F.pdfMelbourne High - Attachment F

 Images

ThumbnailPicture Size
Melbourne 11x17 Landscape

 Calendar

There are no items to show in this view of the "Melbourne Calendar" list. To create a new item, click "New item" above.