Pinewood Elementary

Pinewood Elementary

PROJECT OVERVIEW   
 Pinewood Elementary School has various projects which are stated in Attachment F. The attachment is located in the documents section.
 
PROJECT STATUS
Pinewood Elementary School is one of the schools on the priority list to be addressed through summer 2017.

The project will be done through a design build contract, where the successful firm provides construction and final design/permitting services. This process requires the District to develop a Design Criteria Package (DCP) that is prepared by a third party architect (the Design Criteria Professional) who outlines the scope and minimum specifications and/or requirements for the project. The proposal from the Design Criteria Professional is scheduled for School Board consideration on August 25, 2015.

In order to achieve economies of scale and reduce administrative costs, this project may be combined with other schools on this list for implementation over the next two years. If the project cost remains under $2 million, the District’s continuing contracts for design build services may be used.

 

                    FACILITY RENEWAL                                                                                                                                             

51 01          Safety and Building Code Deficiency Corrections                                                           $151,620

51 02          ADA Code Deficiency Correction                                                                                  $37,210

51 03          Fire Alarm System Renewal                                                                                        $88,367

52 05          Cooling and Heating Control System Renewal                                                               $119,849

52 06          Air Conditioning and Air Distribution Equipment Renewal                                               $547,041

53 08          Exterior Building Wall Finish System Renewal                                                                $19,677

53 09          Exterior Door/Window/Louver System Renewal                                                              $8,944

52 10          Building Water and Sanitary Piping System Renewal                                                       $18,246

52 11          Water Heating System Renewal                                                                                    $16,911

54 12          Electrical Supply System (Transformers, Switchgear, Wiring) Renewal                              $6,082

54 13          Electrical Distribution System Renewal                                                                           $96,806

                    Facility Renewal Total                                                                                                $1,110,753

                                                                                                                                                                                                       

                    EDUCATIONAL TECHNOLOGY                                                                                                                        

65 03          Classroom Technology Infrastructure (Electrical, HVAC, Data)                                          $65,439

                    Educational Technology Total                                                                                    $65,439

                                                                                                                                                                                                       

                    Total All Categories                                                                                                    $1,176,192

 

The District Security project and the remaining Educational Technology components will be handled separately.

Project management, administrative and permitting staff time will be charged to the sales surtax fund.


 
PROJECT UPDATE
 Updates will be posted in this section. 
PROJECT MANAGER
 Arthur Johnson - Project Manager
FUNDING SOURCES
 Project is funded by Half-Cent Sales Surtax
 
DELIVERY METHOD
A Design Build Contractor will be selected through a Request for Proposal process.
DESIGNER/DESIGN CRITERIA PROFESSIONAL
 Design Criteria package is being created by TLC engineering for Architecture.
 
CONTRACTOR
 To Be Determined
 

 Documents

Design Criteria Package TLC Engineering for Architecture Pinewood.pdfDesign Criteria Package TLC Engineering for Architecture PinewoodBREVARDSCHOOLS\Weaver.Debbie
Pinewood Elementary - Attachment F.pdfPinewood Elementary - Attachment FBREVARDSCHOOLS\Weaver.Debbie

 Images

ThumbnailPicture Size
Pinewood 11x17 Landscape

 Calendar

Title
There are no items to show in this view of the "Pinewood Calendar" list. To create a new item, click "New item" above.