Structural cabling upgrades at Rockledge High School are under construction to update educational technology. 
PROJECT STATUS
Rockledge High School is one of eight remaining schools that require structured cabling renovation based on facility age and conditions. Structured Cabling Systems include network, fiber optic, telephone and instructional television components with associated supported electrical and mechanical systems.  Campus-wide electrical distribution panel upgrades are also included in this project. The project was designed previously with tax levy funding. A construction management contract with Heard Construction, Inc. for a Guaranteed Maximum Price (GMP) of $1,520,755.54 was approved by the School Board on June 9, 2015.

Remaining 2006 and 2008 tax levy funds must be closed out immediately and used for cabling renovations. Approximately $821,990 will be utilized for the project and spent first. The balance of $698,765 will be funded by the sales surtax.

Project management, administrative and permitting staff time will be charged to the sales surtax fund. These costs have not been posted to the financial system as of June 5, 2015, but will be included on the next report to the ICOC.


 
PROJECT UPDATE
The structured cabling project, funded with sales surtax, is underway.  This project will not be complete before school starts.  Restrooms in Building 15 and 16 are also under renovation, including an ADA modification.
 
PROJECT MANAGER
Chris Ault - Construction Manager 
FUNDING SOURCES
Project is funded by a combination of Half-Cent Sales Surtax and Tax Levy Funds.
 
DELIVERY METHOD
Construction Management is being performed by Heard Construction, Inc. under the continuing contract for Construction Management Services for the technology structured cabling upgrades.
 
DESIGNER
The project is designed by Premier Engineering
 
CONTRACTOR
Heard Construction, Inc.

 Documents

A- Rockledge Project Status Report_ICOC June 17 2015.pdf
A- Rockledge Project Status Report_ICOC June 17 2015Use SHIFT+ENTER to open the menu (new window).
6/25/2015 12:04 PMBREVARDSCHOOLS\Lindemann.David
B- Rockledge Exhibit 1_ICOC June 17 2015.pdf
B- Rockledge Exhibit 1_ICOC June 17 2015Use SHIFT+ENTER to open the menu (new window).
6/25/2015 12:04 PMBREVARDSCHOOLS\Lindemann.David
Rockledge 11x17 Portrait.pdf
Rockledge 11x17 PortraitUse SHIFT+ENTER to open the menu (new window).
9/3/2015 10:13 AMBREVARDSCHOOLS\Weaver.Debbie
Rockledge 11x17 Print Layout.pdf
Rockledge 11x17 Print LayoutUse SHIFT+ENTER to open the menu (new window).
9/3/2015 10:12 AMBREVARDSCHOOLS\Weaver.Debbie

 Images

ThumbnailPicture Size
Thumbnail IMG_00553264 x 2448
Thumbnail IMG_00503264 x 2448
Thumbnail IMG_00483264 x 2448
Thumbnail IMG_00463264 x 2448
(More Items...)

 Calendar

Title
There are no items to show in this view of the "Rockledge Calendar" list. To create a new item, click "New item" above.