Roosevelt, Theodore Elementary

Theodore Roosevelt Elementary

PROJECT OVERVIEW   
 Theodore Roosevelt Elementary School has various projects to be addressed which are stated in Attachment F.  the attachment is located in the documents section.
 
PROJECT STATUS
Theodore Roosevelt Elementary School is seventh on the priority sales surtax project list based on the priority evaluation system developed in conjunction with the sales surtax referendum.  Some of the mechanical system work that is included on the Attachment F Sales Surtax Funded Detail Report was done in summer 2014. The remainder of the work is planned for summer 2016 (Exhibit 1).

Because the cost of the work is estimated to exceed the $2 million threshold for utilizing the District’s continuing services contracts, the work must be awarded through a competitive process. This project will be done through a design build contract, where the successful firm provides construction and final design/permitting services.  This process requires the District to develop a Design Criteria Package (DCP) that is prepared by a third party architect who outlines the scope and minimum specifications/requirements for the project. The District has contracted with BRPH to prepare the DCP.

In order to achieve economies of scale and reduce administrative costs, this project is being combined with the Discovery Elementary School project. Savings will be achieved in the administration of the contractor selection process and may also be achieved through better pricing because of a larger project (combined value +/- $5.5 million). The costs will be separated by school and by category.

A purchase order has been issued to BRPH to prepare the DCP which includes the following categories as budgeted in Attachment F:

  52 04 Central Mechanical Plant Renewal   $1,037,694
  52 05 Cooling and Heating Control System Renewal   $178,047
  52 06 Air Conditioning and Air Distribution Equipment Renewal   $812,679
  52 10 Building Water and Sanitary Piping System Renewal   $147,817
  54 13 Electrical Distribution System Renewal   $591,271
         
    Total:   $2,933,933

1Some of the components in this category were replaced in 2014. They have been noted in the DCP.

The purchase order (approved by the School Board April 14, 2015), in the amount of $35,000 includes not only the preparation of the DCP but also required services relating to contractor selection and construction administration.

The Educational Technology projects have not yet started.

A not-to-exceed design services contract, in the amount of $7,745, has been issued to Harvard Jolly for the District Security projects. This work covers the following categories on Attachment F Sales Surtax Funded Detail Report (Exhibit 1):

  66 01 Perimeter/Entry Fencing and Gates   $25,010
         
  66 02 Building Access Security Equipment   $26,215
         
    Total:   $51,226

The design fee for the fencing and building access control includes field review and coordination with district security staff and the school principal. The architect will also coordinate with other district staff to ensure that security does not compromise life safety and fire safety codes. The design will provide a menu of access control projects that can be implemented now with the available sales surtax and is easily expandable as additional funding becomes available. The design is funded with sales surtax.

Project management, administrative and permitting staff time will be charged to the sales surtax fund for the Facility Renewal, District Security project and Educational Technology projects. These costs have not been posted to the financial system as of June 5, 2015, but will be included on the next report to the ICOC. 
 

PROJECT UPDATE
 Updates will be posted in this section. 
PROJECT MANAGER

Thomas Hood - Construction Manager 

FUNDING SOURCES
Projects are funded by a combination of Half-Cent Sales Surtax and Capital Renewal
DELIVERY METHOD
A Design Build Contractor will be selected through a Request for Proposals process.
DESIGNER/DESIGN CRITERIA PROFESSIONAL

Design criteria package for up grades to school was created by BRPH Architects-Engineers, Inc.

Security Fencing and Access Control are in the process of design by Harvard Jolly.

CONTRACTOR
 To Be Determined
 

 Documents

1- Roosevelt Elementary - Attachment F.pdf
1- Roosevelt Elementary - Attachment FUse SHIFT+ENTER to open the menu (new window).
6/25/2015 12:02 PMBREVARDSCHOOLS\Lindemann.David
A- Roosevelt Project Status Report_ICOC June 17 2015.pdf
A- Roosevelt Project Status Report_ICOC June 17 2015Use SHIFT+ENTER to open the menu (new window).
6/25/2015 12:03 PMBREVARDSCHOOLS\Lindemann.David
B- Roosevelt Exhibit 1_ICOC June 17 2015.pdf
B- Roosevelt Exhibit 1_ICOC June 17 2015Use SHIFT+ENTER to open the menu (new window).
6/25/2015 12:02 PMBREVARDSCHOOLS\Lindemann.David
Design Criteria Package BRPH Discover and Roosevelt.pdf
Design Criteria Package BRPH Discover and RooseveltUse SHIFT+ENTER to open the menu (new window).
4/19/2016 10:10 AMBREVARDSCHOOLS\Weaver.Debbie
Roosevelt 11x17 Portrait.pdf
Roosevelt 11x17 PortraitUse SHIFT+ENTER to open the menu (new window).
9/3/2015 10:14 AMBREVARDSCHOOLS\Weaver.Debbie
Roosevelt 11x17 Print Layout.pdf
Roosevelt 11x17 Print LayoutUse SHIFT+ENTER to open the menu (new window).
9/3/2015 10:14 AMBREVARDSCHOOLS\Weaver.Debbie

 Images

ThumbnailPicture Size
Roosevelt 11x17 Print Layout
Roosevelt 11x17 Portrait

 Calendar

Title
There are no items to show in this view of the "Roosevelt Calendar" list. To create a new item, click "New item" above.