Sabal Elementary

Sabal Elementary

PROJECT OVERVIEW   
Sabal Elementary School has various projects to be addressed which are stated in Attachment F.  The attachment is located in the documents section.
PROJECT STATUS
Sabal Elementary School is one of the schools on the priority list to be addressed through summer 2017.

Because the cost of the work is estimated to exceed the $2 million threshold for utilizing the District’s continuing service contracts, the work must be awarded through a competitive process. The project will be done through a design build contract, where the successful firm provides construction and final design/permitting services. This process requires the District to develop a Design Criteria Package (DCP) that is prepared by a third party architect (the Design Criteria Professional) who outlines the scope and minimum specifications and/or requirements for the project. The proposal from the Design Criteria Professional is scheduled for School Board consideration on August 25, 2015.

In order to achieve economies of scale and reduce administrative costs, this project will be combined with other schools on this list for implementation over the next two years. The following categories should be included in the project:

                    FACILITY RENEWAL                                                                                                                                             

51 01          Safety and Building Code Deficiency Corrections                                                              $145,842

51 03          Fire Alarm System Renewal                                                                                            $9,447

52 04          Central Mechanical Plant Renewal                                                                                   $540,126

52 05          Cooling and Heating Control System Renewal                                                                  $126,860

52 06          Air Conditioning and Air Distribution Equipment Renewal                                                  $498,130

53 08          Exterior Building Wall Finish System Renewal                                                                   $6,143

53 09          Exterior Door/Window/Louver System Renewal                                                                $186,364

52 10          Building Water and Sanitary Piping System Renewal                                                         $41,967

52 11          Water Heating System Renewal                                                                                      $17,900

54 13          Electrical Distribution System Renewal                                                                            $76,449

                    Facility Renewal Total                                                                                                  $1,968,352

                                                                                                                                                                                                       

                    EDUCATIONAL TECHNOLOGY                                                                                                                        

65 01          Technology Building Cabling                                                                                                                           

65 02          Technology Equipment Renewal                                                                                                                  

65 03          Classroom Technology Infrastructure (Electrical, HVAC, Data)                                         $69,267

                    Educational Technology Total                                                                                   $69,267

                                                                                                                                                                                                       

                    Total All Categories                                                                                                   $2,037,619

 

Purchase orders were issued to replace failed R-22 wall hung air conditioning units in classroom portable N-939 as well as replacing a failed mini-split unit under category 5206.

The District Security project and the remaining Educational Technology components will be handled separately.

Project management, administrative and permitting staff time will be charged to the sales surtax fund.


 
PROJECT UPDATE
Updates will be posted in this section.
 
PROJECT MANAGER
Thomas Hood - Construction Manager
FUNDING SOURCES
 Project is funded by Half-Cent Sales Surtax.
 
DELIVERY METHOD
A Design Build Contractor will be selected through a Request for Proposals process.
DESIGNER/DESIGN CRITERIA PROFESSIONAL
The design criteria package is being created by TLC Engineering for Architecture, Inc. 
CONTRACTOR
To Be Determined
 

 Documents

Design Criteria Package TLC Engineering for Architecture Sabal.pdfDesign Criteria Package TLC Engineering for Architecture Sabal
Sabal Elementary - Attachment F.pdfSabal Elementary - Attachment F

 Images

ThumbnailPicture Size
Sabal 11x17 Portrait

 Calendar

There are no items to show in this view of the "Sabal Calendar" list. To create a new item, click "New item" above.