PROJECT OVERVIEW   
 Stone Middle School has various projects to be addressed which are stated in Attachment F.  The attachment is located in the documents section.
 
PROJECT STATUS
Stone Middle School is one of the schools on the priority list to be addressed through summer 2017.

Because the cost of the work is estimated to exceed the $2 million threshold for utilizing the District’s continuing service contracts, the work must be awarded through a competitive process. The project will be done through a design build contract, where the successful firm provides construction and final design/permitting services. This process requires the District to develop a Design Criteria Package (DCP) that is prepared by a third party architect (the Design Criteria Professional) who outlines the scope and minimum specifications and/or requirements for the project. The proposal from the Design Criteria Professional is scheduled for School Board consideration in September 2015.

In order to achieve economies of scale and reduce administrative costs, this project may be combined with other schools on this list for implementation over the next two years.

         
     FACILITY RENEWAL    
  51 01 Safety and Building Code Deficiency Corrections   $7,935
  52 04 Central Mechanical Plant Renewal   $967,568
  52 05 Cooling and Heating Control System Renewal   $278,155
  52 06 Air Conditioning and Air Distribution Equipment Renewal   $728,663
  53 07 Roofing System Renewal   $3,112,601
  53 08 Exterior Building Wall Finish System Renewal   $76,186
  53 09 Exterior Door/Window/Louver System Renewal   $9,411
  52 10 Building Water and Sanitary Piping System Renewal   $129,282
  52 11 Water Heating System Renewal   $3,587
  54 13 Electrical Distribution System Renewal   $382,384
  52 16 Air Supply and Exhaust System Renewal   $49,488
         
    Facility Renewal Total:   $5,745,260
         
         
     EDUCATIONAL TECHNOLOGY    
         
  65 03 Classroom Technology Infrastructure (Electrical, HVAC, Data)   $151,876
         
    Educational Technology Total:   $151,876
         
         
         
    Total All Catagories:   $5,897,136
         
Purchase orders were issued to replace failed R-22 wall hung air conditioning units in Building 4 Room 408 and replace a failed mini-split unit under category 5206.

The District Security project and the remaining Educational Technology components will be handled separately.

Project management, administrative and permitting staff time will be charged to the sales surtax fund.

PROJECT UPDATE
Updates will be posted in this section.
 
PROJECT MANAGER
David K. Martin - Project Manager
 
FUNDING SOURCES
 Project is funded by Half-Cent Sales Surtax.
 
DELIVERY METHOD
A Design Build Contractor will be selected through the Request for Proposals process.
DESIGNER
To Be Determined 
CONTRACTOR
To Be Determined
 

 Documents

Stone 11x17 Landscape.pdfStone 11x17 Landscape
Stone Middle - Attachment F.pdfStone Middle - Attachment F

 Images

ThumbnailPicture Size
Thumbnail Roof Survey 12-3-15 104000 x 3000
Thumbnail Roof Survey 12-8-154000 x 3000
Thumbnail Roof Survey 12-8-15 64000 x 3000
Thumbnail Roof Survey 12-8-15 54000 x 3000
(More Items...)

 Calendar

There are no items to show in this view of the "Stone Calendar" list. To create a new item, click "New item" above.